Gavin Clarkson

BEng (Hons) Mechanical & Manufacturing Engineering 

Project Title: Continuous Condition-Based Monitoring on the Pickle Line in TATA Steel Trostre

Project Description

Over the last three years the Pickle Line has spent on average over £52,000 on hydraulic oil with no currently plan or strategy in place to reduce this. If this system had been monitored correctly this failure might not have occurred. Project aims: to investigate condition-based monitoring and its benefits and to investigate ways in which to reduce hydraulic oil usage.

Share this page:

Share on facebook
Share on twitter
Share on linkedin